Scroll to top
Photovoltaic (PV) system
NEW LEADER in the field of eco-friendly new and renewable energy and photovoltaics
Photovoltaics system brand of BUGANG E&S
Photovoltaic (PV) system
NEW LEADER in the field of eco-friendly new and renewable energy and photovoltaics
Photovoltaics system brand of BUGANG E&S

New and renewable energy distribution projects (buildings/houses)

Projects that provide financial assistance for a portion of the cost to install new and renewable energy facilities,
thus encouraging the creation and expansion of a newly developed new and renewable energy market
Classification of equipment or capacity (performance) Target and qualifications
Building support projects General 50kW  or less All buildings excluding houses specified in Article 21 of the Regulation on Support, etc. of New and Renewable Energy Facilities notified by the Ministry of Trade, Industry and Energy, and buildings, structures, and the like owned and managed by local governments as specified in Article 26 of the foregoing regulation
Cattle sheds and livestock production facilities
Housing support project Houses Greater than 2.0 kWto3.0 kW or less Detached houses: For who owns or plans to own an existing or a newly built house
Multi-family residences: Representative of the occupants of an existing multi-family residence, the owner or the leader of the occupants (etc.) of a multi-family residence currently under construction
The percentage of the electric bill saved from the installation is about 70%.
Example) When a 3 kW equipment is installed, a monthly average of about 324 kW of power is generated. (3 kW×3.6 hours (daily average amount of power generation)×30 (1 month) = 324 kW)

Electric bill in case the amount of electricity normally used is 400 kW: KRW 65,760
Electric bill on 76 kW excluding 324 kW after the installation of solar power: Only KRW 4,540 to be paid

Installations